At the meltshop of Ferriere Nord in Italy, the commissioning of a set of 3 power conducting arms for AC electric furnace supplied by BRAR has been successfully completed last January. BRAR received from the Customer the acceptance of the equipment supplied. The contract included the engineering and supply of the power conducting arms as well as the supervision of the erection on site. Now the AC electric furnace is fully equipped high current components designed and manufactured by BRAR, including water-cooled cables and the new secondary circuit installed in 2004.
|